|
The section to Senjyojiki of 2611.5 m altitude and distance
are used with with an altitude [ 1661 and 5m ] Shirabidaira as the starting point,
and the Mt. Komagatake ropeway is 2333.5 m,
It is a ropeway to which 950m of vertical intervals are connected like 7m/s and 7 minutes and a half.
This ropeway is famous also as a ropeway reached till the highest place in Japan.
Moreover, 950m of vertical intervals are No.1 of Japan.
It is a surprising steep slope, so that it can think that there are probably the about 50 degrees
of the maximum slant,
Force was perfect also in the ropeway which rode until now.
Moreover, what he was surprised at is a position of the iron pillar of the ropeway.
The support of the crimson ropeway stands on the rocks of the tip of the mountain range
of a precipitous cliff.
Although it went through there by the ropeway, it has built well in such a place.
The difficulties at the time of construction bear at the same time he is very much surprised.
|